The unique combination of fully automated material handling and powerful digital cutting capabilities is key to producing at an industrial level. The Zünd BHS150 extends operating time while decreasing operating costs.
The stack height of 1.5 m allows much longer uninterrupted operating time: long runs are finished efficiently and economically while finished stacks can be removed without interrupting the production process.
The BHS150 is designed for operation with the Zünd G3 and D3 cutter series. D3 dual-beam technology provides a significant increase in performance and thus offers maximum productivity.
The off-load conveyor and stacking system deposits cut boards in a perfect stack on the pallet. Depending on the job, this stacking process eliminates the need for bridges to hold cut pieces in place. This facilitates separating cut parts from scrap, saving both time and money.